What should a factory acceptance test for a jam filling machine include?

Quick answer

The FAT should prove the agreed jam and pack matrix, accepted output, fill tolerance, interventions, faults, cleaning/changeover and evidence. Test is hot, sticky, viscous and can contain fruit pieces under realistic supply conditions, including restart after a controlled stop.

Production-line scene relevant to filling & dosing
Filling & dosing in a production environment
01

What should I check first?

Record the machine state and the finished result before changing settings. This helps identify where control is first being lost.

  • Approve the format and product matrix before the FAT.
  • Define sample size, tolerance, output period and permitted interventions.
  • Include low product, missing pack, stop and restart tests.
  • Record ten consecutive fills by weight and note the product temperature, density or batch condition.
  • Confirm the product supply remains stable at minimum and maximum hopper or tank levels.
02

Why is this production problem happening?

Work from the evidence and change one variable at a time. These are the most relevant causes to investigate first.

  • Acceptance language is subjective or incomplete.
  • Only ideal materials are available at the FAT.
  • Interfaces and utilities are treated as later site issues.
  • The dosing principle is unsuitable for viscosity, particles, aeration or accuracy.
  • Product conditions are changing during the run.
03

How can I correct or improve it?

Make a controlled change, repeat the same measurement and compare the result before moving to the next adjustment.

  • Use a signed protocol with results and open actions.
  • Record settings, samples, video and measured output.
  • Carry unresolved site-interface points into a controlled SAT plan.
  • Stabilise product temperature, mixing and supply before retuning.
  • Test a representative product and pack matrix across the full fill range.
Prepare your application

What should I send Lancing?

The most reliable recommendation is based on representative production materials and a measurable acceptance result.

  • Representative sample of Jam
  • All relevant glass jars or portion packs
  • Target fill and tolerance
  • Required accepted output
  • Photographs or video of the current process
  • Product name and a sample or SDS where relevant
  • Viscosity, temperature, particles, foaming and density

Which applications does this answer cover?

Production stageFilling & dosing
Product or pack routePastes & viscous products
ApplicationJam
Questions people also ask

More quick answers about this problem

What should I check first for jam?+

Approve the format and product matrix before the FAT.

Why does this problem happen with jam?+

Acceptance language is subjective or incomplete.

How can I improve or correct the problem with jam?+

Use a signed protocol with results and open actions.

Which part of the production line does this question relate to?+

This question relates primarily to filling & dosing. It may also be affected by upstream product or pack supply and by downstream handling, so check the full production sequence rather than one machine in isolation.

What should I send when asking for a machinery recommendation?+

Send Representative sample of Jam; All relevant glass jars or portion packs; Target fill and tolerance; Required accepted output. Representative production samples and a measurable acceptance target are normally more useful than a catalogue description alone.

Recommended next step

Explore the relevant Lancing machinery options

Review suitable equipment and application guidance, then request a recommendation based on your product, pack and required accepted output.

pastefillers.co.uk
View machinery options