How do I stop the wrong code being printed on a secondary food pack?
Control job selection, data source, permissions, line clearance and product identity as one recipe. Verification must compare the printed result with the intended order and define what happens to uncertain packs.

What should I check first?
Record the machine state and the finished result before changing settings. This helps identify where control is first being lost.
- Inspect the real secondary food pack surface and its variation.
- Observe inkjet, laser or labelled code matched to the pack at minimum and maximum line speed.
- Record trigger, print, inspection and reject events in sequence.
- Identify every substrate, colour, surface finish and print position.
- Record minimum and maximum line speed and product-to-head distance.
- Inspect triggers, encoders and mounting rigidity during acceleration and stops.
Why is this production problem happening?
Work from the evidence and change one variable at a time. These are the most relevant causes to investigate first.
- The marking technology or consumable is incompatible with the surface.
- Pack position or trigger timing is unstable.
- Data control and physical product tracking are not linked.
- The technology or consumable is unsuitable for the substrate.
- The printhead distance or product movement is inconsistent.
- Trigger and encoder signals do not represent true pack position.
How can I correct or improve it?
Make a controlled change, repeat the same measurement and compare the result before moving to the next adjustment.
- Run adhesion and readability tests after normal handling.
- Stabilise product presentation and sensor timing.
- Implement controlled job selection and verification.
- Print production samples and test durability using an agreed method.
- Rigidly control product position and printhead geometry.
- Use encoder-based control where conveyor speed varies.
What should I send Lancing?
The most reliable recommendation is based on representative production materials and a measurable acceptance result.
- Representative secondary food pack samples
- Exact code content, dimensions and grade
- Minimum and maximum line speed
- Required verification and rejection level
- Environmental and washdown conditions
- Substrate and representative printed samples
- Required code, barcode and character dimensions
Which applications does this answer cover?
More quick answers about this problem
What should I check first for secondary food pack?+
Inspect the real secondary food pack surface and its variation.
Why does this problem happen with secondary food pack?+
The marking technology or consumable is incompatible with the surface.
How can I improve or correct the problem with secondary food pack?+
Run adhesion and readability tests after normal handling.
Which part of the production line does this question relate to?+
This question relates primarily to coding & traceability. It may also be affected by upstream product or pack supply and by downstream handling, so check the full production sequence rather than one machine in isolation.
What should I send when asking for a machinery recommendation?+
Send Representative secondary food pack samples; Exact code content, dimensions and grade; Minimum and maximum line speed; Required verification and rejection level. Representative production samples and a measurable acceptance target are normally more useful than a catalogue description alone.
Explore the relevant Lancing machinery options
Review suitable equipment and application guidance, then request a recommendation based on your product, pack and required accepted output.
inkjetcoder.co.uk